
Shanghai New Bund Binshui area Weak transformation project is an auxiliary projects of the Shanghai World Expo, in the over 100 square meters monitoring room, Viamax provides (2 * 4) 8 sets 50-inch DLP rear projection large screen display monitoring center System and advanced Pollux 5000 graphics controller, which can connect more than 180 surveillance cameras and 15 computers, meanwhile display over 30-way real-time signal on large screen. A variety of network operation and monitoring information can be real-time, intuitive, flexible and diverse way to display on the large screen, which can help opearator efficient organization and processing of various information in the emergency situation and can quickly integrated resources and effective response, For the operation of managers to create a highly efficient and intuitive display environment.
In a modern and intelligent management center, the operator need faces a variety of complex information, and a lot of information need receive, display, analysis and storage, so the large-screen display wall was become the only way to summary information and intuitive way to show in front of the operator, and become the focus for all kind of running and processing.
In order to ensure Shanghai new Bund re-open to the public,Chinese and foreign tourists on schedule , Viamax arranged speical project manager, technical engineers and setting special response team, including project management, resource management, crisis response and a series of rigorous and scientific equipment protection plan, with the most timely and most efficient professional security services, To make extra certain that the expo auxiliary projects- Shanghai New Bund Binshui area Weak transform project work.
